ProcessBefore the quote: five confirmations that change the number
A drawing and a quantity are not a brief. Part count, mask count, wall thickness, approval route and market decide the price long before anyone talks about unit cost.
Read the note
ProcessA drawing and a quantity are not a brief. Part count, mask count, wall thickness, approval route and market decide the price long before anyone talks about unit cost.
Read the note
ProcessHollow vinyl is cheaper to tool and kinder to round shapes. Injection holds thin detail and repeats exactly. A short decision list for the first brief.
Read the note
ToolingMould parts, cavity count and undercuts drive the number far more than the size of the figure. How to read a tooling quote line by line.
Read the note
FinishingEvery colour on a moulded part needs a mask. Counting them before design freeze is the difference between a quote and an argument.
Read the note
MaterialsDe-airing, pour temperature and pressure curing. Why a clear cast fails at the corners first, and what to specify to avoid it.
Read the note
Large formatArmature, anchors, transport sections and UV clear coat. The four decisions that have to be made before the skin is laid up.
Read the note
QualitySeam lines, paint creep, loose joints, colour drift. A short map from the visible fault back to the stage that caused it.
Read the note
ProcessSoft goods win on price and hand feel; vinyl wins on silhouette and shelf presence. Matched against the channel you plan to sell in.
Read the note
QualityMost projects need two rounds and complex paint needs three. What to review in each round so the second one is the last.
Read the note
MaterialsAge grading, small parts, phthalates and labelling decide the material and the construction long before the test report is issued.
Read the noteSend it with the project you are working on. We answer process questions before there is an order on the table — it is the fastest way to find out whether we are the right factory.
One reply with a process route, a sample plan and a price band — no account, no cart, no obligation.